Operation Specification
|
|
Complete operation instructions can be entered with a
few mouse clicks. In the example below all of the text in the text entry fields was entered
with selections made from lists. |
|
Description box instructions need only be typed when
you wish to supplement the instructions to add clarity or details that are specific to
the part or process being performed. |
|
Show Rate button allows Operation Charge Rate to be
changed for a specific operation but does not alter the default rates. |
|
Use Tool checkbox writes instruction to indicate tool
to be used for this operation. |
|
Component to Component lists contain all materials
and all Sub Assemblies and the Primary Part. This allows the entry of
instructions for work to be performed on Sub Assemblies, e.g. laminate
Backplate sub assembly to Overlay sub assembly. |